Rain at the centre of Singapore fills reservoirs; rain at the edges used to run straight out to sea. The Marina Barrage closed the biggest of those dead ends, desalination and NEWater closed the loop, and Long Island could close the next one.

Singapore gets plenty of rain and has very little land to keep it on. In 1963 the island lived through ten months of water rationing. Sixty years later, the taps run all year. What has changed is that the whole island has been drawn, piece by piece, into one water system. This is that story as I see it, told with a few diagrams of our own and photos from my drone flights over Marina Bay and the East Coast.
The centre and the edges
Think of the island in two parts. At its centre lies a protected forest, and in it sit the oldest reservoirs, beginning with MacRitchie in the 1860s. Rain that falls on the forest runs into them. That is the central catchment.
The edges are different. There, rain runs off roofs and roads into drains and canals, and after a short trip it reaches the sea. For most of Singapore’s history the edge catchments were dead ends: the water fell on the city, passed through it and was lost.
From the 1970s the water planners began to close those dead ends one at a time. In the west, a dam on the upper Jurong River made Jurong Lake in 1971, and in 1974 an earthen dyke closed off the swampy estuary of the Sungei Pandan to make Pandan Reservoir. Dams across the mouths of other rivers in the north and west, such as Kranji, turned their estuaries into reservoirs too. Even so, by the mid-2000s only about half of the island drained into a reservoir. The other half, including the city centre, still drained to the sea.
To show this, we drew our own catchment diagram from open map data. Each patch of land takes the colour of the place where its nearest stream or canal leads: a reservoir, or the sea. It shows only the rain that reaches a reservoir by gravity. Pumps and collection ponds bring in rain from more of the edges, so the official share is larger than the coloured area.

Marina Bay: a dead end becomes a reservoir
The biggest dead end was the city itself. The Singapore River, the Kallang River, the Geylang River, the Rochor Canal and the Stamford Canal all flow into Marina Bay. From there the water used to run out through the Marina Channel to the sea.
The Marina Barrage closed that channel. It opened in 2008, and behind it the rain slowly turned the bay from salt water to fresh. In 2010 it became Marina Reservoir, the country’s 15th and the first in the heart of the city. Its catchment covers 10,000 hectares, about one-sixth of Singapore, and it is the largest and most built-up catchment on the island. Together with two more estuary reservoirs at Punggol and Serangoon, finished in 2011, it raised the share of land that collects water from half to two-thirds.
The barrage does more than store water. Its crest gates and pumps protect the low parts of the city from floods at high tide, and the steady water level behind it suits kayaks and dragon boats. On a windy afternoon its green roof fills with kites.

What strikes me most is that it only works because of a decision made long before. A reservoir in the middle of a city needs clean rivers. From 1977 to 1987, Singapore cleaned up the Singapore River and the Kallang Basin and removed the sources of pollution along them. Without that work, the bay could never have become a source of drinking water.

Water from the sea
Rain alone is not enough for almost six million people, so Singapore also makes fresh water from the sea. The first desalination plant opened in 2005, and there are now five. By PUB’s figures of 2018, desalination can meet up to 30 per cent of the country’s water demand. The Keppel Marina East Desalination Plant, a short ride from the barrage, shows how closely the pieces now fit. In dry weather it desalinates seawater. When it rains, it treats fresh water from Marina Reservoir instead, which takes less energy. Its works sit underground, below a public lawn.

One loop
The water planners speak of the Four National Taps: local catchment, imported water, NEWater and desalination. Imported water comes from the Johor River in Malaysia: an agreement of 1962 lets Singapore draw up to 250 million gallons a day until 2061. NEWater, introduced in 2002, is used water cleaned with membranes and ultraviolet light until it is fit to drink. In 2018 PUB said it could meet up to 40 per cent of the country’s water demand. These figures are what each tap can give, not a fixed split: how much comes from the reservoirs still depends on the rain. Most NEWater goes to industry, and in dry spells some of it tops up the reservoirs.
The part you never see is underground. Singapore keeps rain and used water apart. Rain goes into the open drains and canals that feed the reservoirs; used water goes into sewers. The first phase of the Deep Tunnel Sewerage System, finished in 2008, carries used water from the eastern half of the island through a 48-kilometre tunnel, by gravity, to a large water reclamation plant at Changi. It replaced three older plants and a string of pumping stations. The tunnels of the second phase, which will serve the west and lead to a new plant at Tuas, were finished in August this year. When the system is complete, the government expects it to roughly halve the land used for used-water works and free about 150 hectares.
Put together, the pieces make a loop. Rain is caught, treated and used; the used water is cleaned and used again; the sea and the Johor River add what the island cannot catch.

The next catchment: Long Island
The East Coast is still a dead end. Twelve outlet drains between Marina East and Tanah Merah carry rain from the eastern suburbs straight into the sea.
At the National Day Rally in 2019, the Prime Minister described one way to change that: reclaim islands off the East Coast, join them with barrages and create a freshwater reservoir behind them. At the end of last month the government set out the idea, called Long Island, in more detail. It would be about 800 hectares of new land in three long parcels between Marina East and Tanah Merah, raised high enough to defend the coast against rising seas. The water between the new land and East Coast Park would become a reservoir, which PUB expects to be Singapore’s 18th. Two barrages with pumping stations would keep the sea out and let floodwater go, as the Marina Barrage does. Technical studies are to start in 2024 and take about five years, and the whole project will take decades.
The stakes are high. About 30 per cent of Singapore lies less than five metres above the sea, and the sea level could rise by up to a metre by 2100. The other option studied was a sea wall up to three metres high along East Coast Park, with a pumping station at each of the twelve drains. It would have taken up park space and limited access to the water. The island would do the same defensive job, add about 20 kilometres of new parks along the coast and the reservoir, and turn one more dead end into a catchment.
Our third diagram shows how the idea fits the pattern. It is our own schematic, drawn after the published concept, and not an official plan.

What a whole system gives a city
No single project here is the point. A barrage on its own is a flood gate. A desalination plant on its own is an expensive way to make water. What makes Singapore’s water secure is that each piece was planned with the others in mind: clean rivers before the city reservoir, separate sewers before NEWater, deep tunnels before the land they free. Since 2001 one agency, PUB, has looked after the water supply, the drains and the used water together, so the whole cycle has a single owner.
For me as an architect there is a second lesson. Much of this machinery gives something back to the people around it: the roof of the barrage, the lawn over the desalination plant, a lake for paddling in the middle of the city. Most cities have edges that are dead ends of some kind. Singapore shows how far patient, joined-up planning can go in closing them.
Update, November 2026: Long Island now has a more detailed plan. In March 2026 the Urban Redevelopment Authority announced preparatory works, and in June it gave the details with the Housing and Development Board. The works start at the end of 2026 and do not reclaim land yet. They clear obstructions from the seabed and lay a first sand platform with temporary bunds, at least 130 metres from the shore. Phase 1 covers about 570 hectares of water west of Bedok Jetty and runs about 7 kilometres from east to west. Phase 2, about 155 hectares east of the jetty, starts only after the 2029 Southeast Asian Games. The agencies say that the works area does not fix the final shape of the land. That land is to hold new homes, amenities and industry, beside the new reservoir. More than 14,000 people have taken part in the public engagement so far. The third national climate change study now projects a rise in sea level of up to 1.15 metres by 2100.
Photos by Jonathan Choe. Map data © OpenStreetMap contributors (ODbL).
Images: Archigardener, unless otherwise stated.





