Rain at the centre of Singapore fills reservoirs; rain at the edges used to run straight out to sea. The Marina Barrage closed the biggest of those dead ends, desalination and NEWater closed the loop, and Long Island could close the next one.

An aerial view of a building with a curved green roof, solar panels and a round courtyard at the edge of the water, with dark green reservoir water behind a line of gates and turquoise sea in front, crossed by a footbridge with a round jetty
Marina Barrage from the air: the fresh water of the reservoir behind the gates, the sea in front. February 2020.

Singapore gets plenty of rain and has very little land to keep it on. In 1963 the island lived through ten months of water rationing. Sixty years later, the taps run all year. What has changed is that the whole island has been drawn, piece by piece, into one water system. This is that story as I see it, told with a few diagrams of our own and photos from my drone flights over Marina Bay and the East Coast.

The centre and the edges

Think of the island in two parts. At its centre lies a protected forest, and in it sit the oldest reservoirs, beginning with MacRitchie in the 1860s. Rain that falls on the forest runs into them. That is the central catchment.

The edges are different. There, rain runs off roofs and roads into drains and canals, and after a short trip it reaches the sea. For most of Singapore’s history the edge catchments were dead ends: the water fell on the city, passed through it and was lost.

From the 1970s the water planners began to close those dead ends one at a time. In the west, a dam on the upper Jurong River made Jurong Lake in 1971, and in 1974 an earthen dyke closed off the swampy estuary of the Sungei Pandan to make Pandan Reservoir. Dams across the mouths of other rivers in the north and west, such as Kranji, turned their estuaries into reservoirs too. Even so, by the mid-2000s only about half of the island drained into a reservoir. The other half, including the city centre, still drained to the sea.

To show this, we drew our own catchment diagram from open map data. Each patch of land takes the colour of the place where its nearest stream or canal leads: a reservoir, or the sea. It shows only the rain that reaches a reservoir by gravity. Pumps and collection ponds bring in rain from more of the edges, so the official share is larger than the coloured area.

A diagram map of Singapore in a pale blue sea: at the centre a green forest with blue reservoirs, ringed by a dark yellow central catchment, pale yellow catchments of other reservoirs in the north and west, a large red Marina catchment around the city centre, and hatched land at the edges marked as running to the sea, crossed by blue rivers and canals. Small red marks show the dams at Jurong Lake, 1971, and Pandan, 1974, in the west, the Marina Barrage, 2008, and Punggol and Serangoon, 2011, in the north-east
Where Singapore's rain goes, with the dams that closed the edges: Jurong Lake (1971) and Pandan (1974) in the west, the Marina Barrage (2008), Punggol and Serangoon (2011). Our diagram; the catchments are traced from the OpenStreetMap waterway network and are approximate. Map data © OpenStreetMap contributors (ODbL).

Marina Bay: a dead end becomes a reservoir

The biggest dead end was the city itself. The Singapore River, the Kallang River, the Geylang River, the Rochor Canal and the Stamford Canal all flow into Marina Bay. From there the water used to run out through the Marina Channel to the sea.

The Marina Barrage closed that channel. It opened in 2008, and behind it the rain slowly turned the bay from salt water to fresh. In 2010 it became Marina Reservoir, the country’s 15th and the first in the heart of the city. Its catchment covers 10,000 hectares, about one-sixth of Singapore, and it is the largest and most built-up catchment on the island. Together with two more estuary reservoirs at Punggol and Serangoon, finished in 2011, it raised the share of land that collects water from half to two-thirds.

The barrage does more than store water. Its crest gates and pumps protect the low parts of the city from floods at high tide, and the steady water level behind it suits kayaks and dragon boats. On a windy afternoon its green roof fills with kites.

An aerial view across a wide green lawn on a roof, with a curving ramp around a sunken courtyard, a few small figures far off, and beyond the trees the Marina Bay Sands towers, the glass domes of Gardens by the Bay, the Singapore Flyer and the city skyline under a cloudy sky
The green roof of the Marina Barrage is a public park, with Marina Bay Sands, Gardens by the Bay and the city towers behind. February 2020.

What strikes me most is that it only works because of a decision made long before. A reservoir in the middle of a city needs clean rivers. From 1977 to 1987, Singapore cleaned up the Singapore River and the Kallang Basin and removed the sources of pollution along them. Without that work, the bay could never have become a source of drinking water.

An aerial view over a wide body of calm green water, with a glass conservatory and planted gardens along the left shore, a road bridge across the water and Marina Bay Sands and city towers beyond
Marina Reservoir, a freshwater lake in the city, with Gardens by the Bay on the left and the towers of Marina Bay behind. December 2020.

Water from the sea

Rain alone is not enough for almost six million people, so Singapore also makes fresh water from the sea. The first desalination plant opened in 2005, and there are now five. By PUB’s figures of 2018, desalination can meet up to 30 per cent of the country’s water demand. The Keppel Marina East Desalination Plant, a short ride from the barrage, shows how closely the pieces now fit. In dry weather it desalinates seawater. When it rains, it treats fresh water from Marina Reservoir instead, which takes less energy. Its works sit underground, below a public lawn.

An aerial view of a large oval lawn on a low building with a white canopy, ringed by stepped ponds, with fields, a grey service building and the Marina Bay skyline behind
The Keppel Marina East Desalination Plant: the treatment works lie under the oval lawn. December 2020.

One loop

The water planners speak of the Four National Taps: local catchment, imported water, NEWater and desalination. Imported water comes from the Johor River in Malaysia: an agreement of 1962 lets Singapore draw up to 250 million gallons a day until 2061. NEWater, introduced in 2002, is used water cleaned with membranes and ultraviolet light until it is fit to drink. In 2018 PUB said it could meet up to 40 per cent of the country’s water demand. These figures are what each tap can give, not a fixed split: how much comes from the reservoirs still depends on the rain. Most NEWater goes to industry, and in dry spells some of it tops up the reservoirs.

The part you never see is underground. Singapore keeps rain and used water apart. Rain goes into the open drains and canals that feed the reservoirs; used water goes into sewers. The first phase of the Deep Tunnel Sewerage System, finished in 2008, carries used water from the eastern half of the island through a 48-kilometre tunnel, by gravity, to a large water reclamation plant at Changi. It replaced three older plants and a string of pumping stations. The tunnels of the second phase, which will serve the west and lead to a new plant at Tuas, were finished in August this year. When the system is complete, the government expects it to roughly halve the land used for used-water works and free about 150 hectares.

Put together, the pieces make a loop. Rain is caught, treated and used; the used water is cleaned and used again; the sea and the Johor River add what the island cannot catch.

A flow diagram above a pale blue band of sea: boxes for local catchment, marked 2/3 of the land, imported water, marked up to 250 million gallons a day, and desalination, marked up to 30 per cent of demand and fed by seawater from below, sit on the left and feed waterworks and homes and industry along blue fresh-water lines; grey lines of used water drop into a long black deep tunnel that leads to water reclamation, which feeds NEWater, in red, marked up to 40 per cent of demand, back to industry and, in dry spells, to the reservoirs
One system, four taps, each with the figure that PUB and the environment ministry give for it: rain is caught on two-thirds of the land; the 1962 agreement lets Singapore draw up to 250 million gallons a day from the Johor River; NEWater and desalination can meet up to 40 and 30 per cent of water demand (PUB, 2018). The figures are not a split of the supply, and no official split exists. Our diagram, schematic, not to scale.

The next catchment: Long Island

The East Coast is still a dead end. Twelve outlet drains between Marina East and Tanah Merah carry rain from the eastern suburbs straight into the sea.

At the National Day Rally in 2019, the Prime Minister described one way to change that: reclaim islands off the East Coast, join them with barrages and create a freshwater reservoir behind them. At the end of last month the government set out the idea, called Long Island, in more detail. It would be about 800 hectares of new land in three long parcels between Marina East and Tanah Merah, raised high enough to defend the coast against rising seas. The water between the new land and East Coast Park would become a reservoir, which PUB expects to be Singapore’s 18th. Two barrages with pumping stations would keep the sea out and let floodwater go, as the Marina Barrage does. Technical studies are to start in 2024 and take about five years, and the whole project will take decades.

The stakes are high. About 30 per cent of Singapore lies less than five metres above the sea, and the sea level could rise by up to a metre by 2100. The other option studied was a sea wall up to three metres high along East Coast Park, with a pumping station at each of the twelve drains. It would have taken up park space and limited access to the water. The island would do the same defensive job, add about 20 kilometres of new parks along the coast and the reservoir, and turn one more dead end into a catchment.

2 drawings at the same scale. Tap one to open it full size.

Our third diagram shows how the idea fits the pattern. It is our own schematic, drawn after the published concept, and not an official plan.

A diagram map of Singapore's East Coast: a pink Marina catchment with blue Marina Reservoir on the left, a yellow east coast catchment whose blue drains point to the coast, a thin green strip of East Coast Park along the shore, and in the pale blue sea three rounded grey parts of new land, a long wedge from Marina East, a long middle part with a round west end and a short east part at Tanah Merah, enclosing a narrow hatched blue reservoir along the coast, with two red barrages in the gaps between the parts
Long Island as one more catchment. Our schematic, after the published concept: about 800 hectares of new land in three parts from Marina East to Tanah Merah, two barrages, and a new reservoir between the new land and East Coast Park. Not an official plan. Map data © OpenStreetMap contributors (ODbL).

What a whole system gives a city

No single project here is the point. A barrage on its own is a flood gate. A desalination plant on its own is an expensive way to make water. What makes Singapore’s water secure is that each piece was planned with the others in mind: clean rivers before the city reservoir, separate sewers before NEWater, deep tunnels before the land they free. Since 2001 one agency, PUB, has looked after the water supply, the drains and the used water together, so the whole cycle has a single owner.

For me as an architect there is a second lesson. Much of this machinery gives something back to the people around it: the roof of the barrage, the lawn over the desalination plant, a lake for paddling in the middle of the city. Most cities have edges that are dead ends of some kind. Singapore shows how far patient, joined-up planning can go in closing them.

Update, November 2026: Long Island now has a more detailed plan. In March 2026 the Urban Redevelopment Authority announced preparatory works, and in June it gave the details with the Housing and Development Board. The works start at the end of 2026 and do not reclaim land yet. They clear obstructions from the seabed and lay a first sand platform with temporary bunds, at least 130 metres from the shore. Phase 1 covers about 570 hectares of water west of Bedok Jetty and runs about 7 kilometres from east to west. Phase 2, about 155 hectares east of the jetty, starts only after the 2029 Southeast Asian Games. The agencies say that the works area does not fix the final shape of the land. That land is to hold new homes, amenities and industry, beside the new reservoir. More than 14,000 people have taken part in the public engagement so far. The third national climate change study now projects a rise in sea level of up to 1.15 metres by 2100.

Photos by Jonathan Choe. Map data © OpenStreetMap contributors (ODbL).

Images: Archigardener, unless otherwise stated.

Related posts

Leave a comment

Your email address will not be published. Required fields are marked *

Comments appear after Jonathan reads them.